ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Discussions on Criteria for Soil Reinforcement during EPB
Shields&rsquo|Launching &|Arrival Construction in Soft Ground

  • HU Xin-Peng ,
  • SUN Mou ,
  • WANG Dun-Lan
Expand
  • 1. China Railway Tunnel Joint Stock Co., Ltd2. Beijing Jiaotong University

Received date: 2006-02-14

  Online published: 2010-04-16

Abstract

The present criteria for the soil reinforcement during EPB shields’ launching and arrival construction in soft ground adopted in China are mainly based on Japanese experience, i.e., the length of the soil reinforcement for the shield launching is 6m, the length of the soil reinforcement for the shield arrival is 3.5m and the strength of the soil reinforcement ranges from 0.8MPa to 1.5MPa. Due to the fact that the normal strength of the reinforced soil is higher than 1.5MPa, the authors, based on the construction experience in the job site, suggest that the reasonable length of the soil reinforcement for the launching and arrival of shield machines under normal conditions should be 3.5m. On basis of the special features of sand ground, the authors recommend the reinforcement patterning for shield arrivals in sand ground. Furthermore, the authors, on basis of the waterproofing purpose of the reinforced soil and the construction methods adopted in the job site, suggest that the existing soil reinforcement criteria should be modified.

Cite this article

HU Xin-Peng , SUN Mou , WANG Dun-Lan . Discussions on Criteria for Soil Reinforcement during EPB
Shields&rsquo|Launching &|Arrival Construction in Soft Ground[J]. Tunnel Construction, 2006
, 26(5) : 11 -13 . DOI: A

Outlines

/

〈 〉