Construction of Longfeng Tunnel Penetrating
across underneath Existing Jianshanzi Tunnel

  • FU Jiang ,
  • ZHANG Xi-Bao
Expand
  • The 1st Engineering Co., Ltd., of China Railway the 5th Bureau Group

Received date: 2006-01-16

  Online published: 2010-04-16

Abstract

The paper presents the construction method adopted for the construction of Longfeng tunnel on bid 2 section of approach line of SuiYu railway, which penetrates across underneath the existing Jianshanzi tunnel on Yuhe highway. From the general principles and requirements for the tunnel construction, the paper presents in detail such tunnel construction sequences as installation of piperoof protection, excavation and reinforcement, measurement and monitoring, installation of invert and lining. Furthermore, the paper briefly presents the protection measures and contingency countermeasures taken for the tunnel construction.

Cite this article

FU Jiang , ZHANG Xi-Bao . Construction of Longfeng Tunnel Penetrating
across underneath Existing Jianshanzi Tunnel[J]. Tunnel Construction, 2006
, 26(5) : 66 -69 . DOI: B

Outlines

/

〈 〉