ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Equipment Matching of a Largescale
Earth/rock Engineering Works in Shenzhen

  • HE Zhen-Guo
Expand
  • No.1 Division of China Railway Tunnel Group Co., Ltd.

Received date: 2005-08-22

  Revised date: 2006-07-20

  Online published: 2010-04-16

Abstract

Taking a largescale earth/rock engineering works in Shenzhen as an example, the paper presents the calculation method for the equipment matching of an earth/rock engineering works. The paper places its emphasis on the expatiation of the matching principle and calculation method for the drilling equipment, excavating and loading equipment and transportation equipment. Furthermore, the paper makes comparisons between the production capability of theadopted matchingscheme and the quota data specified in the highway budget and municipal budget. The optimization of the equipment matching is of fundamental importance for the project to improve its production efficiency and reduce its engineering cost.

Cite this article

HE Zhen-Guo . Construction Equipment Matching of a Largescale
Earth/rock Engineering Works in Shenzhen[J]. Tunnel Construction, 2006
, 26(5) : 79 -81,96 . DOI: B

Outlines

/

〈 〉