Breakthrough Clearance Survey of Metro Tunnels
Transferred from Existing Airraid Tunnels
Received date: 2006-03-24
Online published: 2009-12-11
The existing 7381 airraid tunnel will be used to build Phase 1 project of MRT system in Harbin. The paper presents the contents of the breakthrough clearance survey that is needed in order to transfer the existing airraid tunnel into Metro tunnel. On basis of comparing the measured crosssections with the designed clearance, the paper makes analysis on the results of the breakthrough clearance survey and draws its preliminary conclusion.