ISSN 2096-4498
CN 44-1745/U
ISSN 2096-4498
CN 44-1745/U
Application of Multiboom Rock Drilling jumbos in Advance Pre
grouting Hole Drilling during Construction of Mined Tunnels
Received date: 2009-04-15
Revised date: 2009-05-05
Online published: 2009-12-08
Taking the application of the 3boom rock drilling jumbos in the advance pregrouting hole drilling during the construction of Xiang'an subsea tunnel in Xiamen as an example, the author presents the application technologies and application scopes of multiboom rock drilling jumbos in advance pregrouting hole drilling in fullyheavily weathered ground during construction of mined tunnels, by making comparison and contrast between multiboom rock drilling jumbos and other drilling machines. This paper can provide reference for similar projects in the future.
LOU Zhang-Yin
. Application of Multiboom Rock Drilling jumbos in Advance Pre
grouting Hole Drilling during Construction of Mined Tunnels[J]. Tunnel Construction, 2009
, 29(5)
: 582
-586
.
DOI: B
/
| 〈 |
|
〉 |