ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Technology of Small Crosssection
Subsea Tunnel by means of Slurry Shield Machine

  • ZHANG Hua-Jun ,
  • XIE Ren-Gen ,
  • MA Xiao-Ding
Expand
  • The 1st TBM Construction Branch of the 2nd Engineering Co.| Ltd. of China Railway
    Tunnel Group, Yanjiao 101601, Beijing, China

Received date: 2006-03-08

  Revised date: 2006-04-03

  Online published: 2009-12-31

Abstract

Taking Qianwan sub-sea tunnel in Shenzhen as an example, the article presents the construction principles and construction methods of a subsea tunnel by means of slurry shield machine, including the basic construction procedures and the construction management criteria. The article places its emphasis on the description of the preparation works for the launching of the shield machine, items which special attention should be paid to during trial boring and the control of various parameters of normal boring. 

Cite this article

ZHANG Hua-Jun , XIE Ren-Gen , MA Xiao-Ding . Construction Technology of Small Crosssection
Subsea Tunnel by means of Slurry Shield Machine[J]. Tunnel Construction, 2006
, 26(增刊1) : 1 -4,24 . DOI: B

Outlines

/

〈 〉