Boring of Shield Machine through Different Ground Conditions

  • WANG Fu-Li
Expand
  • The 1st TBM Construction Branch of the 2nd Engineering Co.| Ltd. of China Railway
    Tunnel Group, Yanjiao 101601, Beijing, China

Received date: 2006-03-08

  Online published: 2009-12-31

Abstract

On basis of the actual situations of the boring of the shield machine in soft ground and hard ground, the article makes analysis on the influence of the ground conditions on the boring of the shield machine, from which the boring parameters of the shield machine in soft ground and hard ground are obtained. Then the article compares the boring parameters in soft ground with those in hard ground. On basis of the anaylsis on the special incidents encountered during the boring of the slurry shield machine in various grounds, the article recommends the relevant countermeasures so as to facilitate the construction of the tunnel and to extend the service life of the shield machine. 

Cite this article

WANG Fu-Li . Boring of Shield Machine through Different Ground Conditions[J]. Tunnel Construction, 2006 , 26(增刊1) : 13 -14,21 . DOI: B

Outlines

/

〈 〉