Reasons for Pipe Blocking of Pumped Concrete for Lining of Passenger
dedicated Railway Tunnels and their Prevention Measures

  • CHEN Zhi
Expand
  • Scientific Research Institute of China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China

Received date: 2007-06-01

  Online published: 2010-01-05

Abstract

The concrete for the lining of the passengerdedicated railway tunnels are produced as per the requirements for durable concrete. The raw material quality, workability and transportation and casting technologies of the concrete have their own special requirements. Due to the problems in the construction organization, concrete's workability, concrete construction equipment and working labors, pipe blocking may occur during the pumping of the concrete. On basis of the concrete construction of No. 3 bid section of Hefei~Wuhan passengerdedicated railway, the author summarizes the reasons for the pipe blocking and their prevention measures in the paper.

Cite this article

CHEN Zhi . Reasons for Pipe Blocking of Pumped Concrete for Lining of Passenger
dedicated Railway Tunnels and their Prevention Measures[J]. Tunnel Construction, 2007
, 27(增刊1) : 27 -29,46 . DOI: B

Outlines

/

〈 〉