ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Geology Prediction Technology Applied in Changlingguan Tunnel on
Hefei~Wuhan Passengerdedicated Railway

  • LUO Hong-Ban
Expand
  • Changlingguan Lot of No. 3 Bid Section of Hefei~Wuhan Passengerdedicated
    Railway, China Railway Tunnel Group, Jinzhai 237351, Anhui, China

Received date: 2007-03-19

  Revised date: 2007-05-21

  Online published: 2010-01-05

Abstract

Taking Changlingguan tunnel as an example, the author presents some geology prediction methods that are suitable for the tunnel and are widely used on Hefei~Wuhan passengerdedicated railway in terms of working principle, applicability, advantages/disadvantages and application results, which can provide reference for the geology prediction of long tunnels and underground works in the future.

Cite this article

LUO Hong-Ban . Geology Prediction Technology Applied in Changlingguan Tunnel on
Hefei~Wuhan Passengerdedicated Railway[J]. Tunnel Construction, 2007
, 27(增刊1) : 30 -32,39 . DOI: B

Outlines

/

〈 〉