ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Waterproofing and Drainage Construction Technology for Hongshiyan
Tunnel on Passengerdedicated Railway

  • LIANG Dong ,
  • LIAO Zhen-Fang
Expand
  • Working Lot of Hongshiyan Tunnel, No. 3 Bid Section of Hefei~Wuhan
    Passengerdedicated Railway, China Railway Tunnel Group, Jinzhai 237300, Anhui, China

Received date: 2007-03-19

  Revised date: 2005-05-16

  Online published: 2010-01-05

Abstract

 Located in Dabieshan mountainous area, Hongshiyan tunnel on Hefei~Wuhan passengerdedicated railway crosses mountainous cloughs, where there develop ground water, concentrated joints and local permeable fractured rock masses. During the construction of the tunnel, the principle that "comprehensive countermeasures, such as waterproofing, drainage and waterstopping, are taken in accordance with the actual conditions of the tunnel" are adopted and special attentions are paid to the details of the waterproofing and drainage construction, which results in good waterproofing effects.

Cite this article

LIANG Dong , LIAO Zhen-Fang . Waterproofing and Drainage Construction Technology for Hongshiyan
Tunnel on Passengerdedicated Railway[J]. Tunnel Construction, 2007
, 27(增刊1) : 43 -46 . DOI: B

Outlines

/

〈 〉