ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Discussion on Rapid Construction Technology of Xingwangmao Tunnel

Expand
  • 1. Scientific Research Institute under China Railway Tunnel Group, Luoyang 471009, Henan, China|
    2. The 1st Engineering Co., Ltd. of China Railway Tunnel Group, Chongqing 401121, China

Received date: 2009-07-02

  Revised date: 2009-09-07

  Online published: 2010-01-04

Abstract

Taking the construction of Xingwangmao tunnel on TaiyuanZhongwei railway in poor geology and bitter climate as an example, the authors present the rapid construction technologies for tunnels in such complicated geological conditions as collapsed loess, argillaceous siltstone, sandstone and mudstone, alternative strata and ground with developed joints and stratifications, high water levels and large scale of irregular sand lens at the arch position, which include drilling and blasting technology, excavation and transportation technology, waterproofing and drainage technology during construction and tunnel ventilation technology. This paper can provide reference for similar projects in the future.

Cite this article

Gao Pan, Pei Zhimin . Discussion on Rapid Construction Technology of Xingwangmao Tunnel[J]. Tunnel Construction, 2009 , 29(增刊2) : 181 -183 . DOI: B

Outlines

/

〈 〉