ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Technology of Connnection Portion
between Shielddriven Tunnel and Mined Tunnel

  • MA Xiao-Ding
Expand
  • The 1st TBM Construction Branch of the 2nd Engineering Co.| Ltd. of China Railway
    Tunnel Group, Yanjiao 101601, Beijing, China

Received date: 2006-03-08

  Revised date: 2006-04-03

  Online published: 2009-12-31

Abstract

Due to the serious damages of the cutting tools of the shield machine after longdistance boring in sand layers, as well as the hardsoft heterogeneous ground conditions in the portion of the tunnel, it would be of great difficulty for the shield machine to drive through the tunnel portion. On basis of the comprehensive evaluations on the requirements of the construction schedules and the feasibility of various connection alternatives, the alternative of mined tunnel is determined to be adopted. The article presents the construction technology of the connection portion between the shielddriven tunnel and the mined tunnel in detail.

Cite this article

MA Xiao-Ding . Construction Technology of Connnection Portion
between Shielddriven Tunnel and Mined Tunnel[J]. Tunnel Construction, 2006
, 26(增刊1) : 22 -24 . DOI: B

Outlines

/

〈 〉