Construction Technology for Service Tube of Xiang’an
Subsea Tunnel in Xiamen Crossing F1 Deep Weathered Slot
Received date: 2009-06-29
Revised date: 2009-09-01
Online published: 2010-01-04
The construction of subsea tunnels crossing deep weathered slot is unprecedented in China. Geology forecasting technology, monitoring and measurement technology, advance full face deephole grouting technology, advance pipe roof reinforcement technology and other assistant construction technologies are adopted, after 9month research and practice, for the construction of the service tube of Xiang'an subsea tunnel in Xiamen crossing F1 deep weathered slot. In addition, NATM (New Austrian Tunneling Method) is strictly implemented during excavation and support. Owing to all the above measures, the 90mlong F1 subsea deep weathered slot, which has great risks, is conquered. The construction technology of the service tube crossing F1 subsea deep weathered slot is presented in the paper, which can provide reference for similar projects in the future.
JING Yong-Jun
. Construction Technology for Service Tube of Xiang’an
Subsea Tunnel in Xiamen Crossing F1 Deep Weathered Slot[J]. Tunnel Construction, 2009
, 29(增刊2)
: 157
-162,183
.
DOI: B
/
| 〈 |
|
〉 |