Analysis and Countermeasures for Risks in
Shield Boring in Fine Silty Sand Ground

  • LI Fa-Yong
Expand
  • China Railway Tunnel Stock Co., Ltd., Zhengzhou 450003, China

Received date: 2009-10-09

  Revised date: 2009-11-19

  Online published: 2010-01-06

Abstract

Taking the shield boring of Nanjing Metro in fine silty sand ground as an example, the author analyzes the main risks in tunnel boring and summarizes the construction countermeasures, particularly in aspect of water inflow, sand inflow, ground surface settlement and building/structure deformation. In the end, the risks have been brought under effective control. The countermeasures presented in the paper, especially those for shield boring under brickmasonry workshops without foundations, can provide reference for similar projects in the future.

Cite this article

LI Fa-Yong . Analysis and Countermeasures for Risks in
Shield Boring in Fine Silty Sand Ground[J]. Tunnel Construction, 2009
, 29(6) : 668 -673,677 . DOI: B