Design and Construction of Shield Rehabilitation
Shaft under Complex Environment
Received date: 2009-06-25
Revised date: 2009-08-03
Online published: 2010-01-06
A large scale shield machine boring in sandcobble ground is jammed and a shaft is constructed ahead of the shield machine for the purpose of shield releasing. The design and construction of the shaft, the boring of the released shield and the backfilling construction of the shaft are presented in the paper, which can provide reference for similar projects in the future.
ZHANG Zhao-Jun
,
HE Shan-Ning
. Design and Construction of Shield Rehabilitation
Shaft under Complex Environment[J]. Tunnel Construction, 2009
, 29(6)
: 683
-688
.
DOI: B
/
| 〈 |
|
〉 |