Abstract

On basis of the survey practice in TianHua shieldbored running tunnel on line 3 of Guangzhou Metro, the author presents the survey works in the construction of the shieldbored Metro tunnels, analyzes on the influence of the traverse survey accuracy on the holingthrough accuracy and recommends some countermeasures to improve the holingthrough accuracy.

Cite this article

SHU Hong-Meng . Discussion on Survey Technology for Improving Holingthrough
Accuracy of Shieldbored Tunnels[J]. Tunnel Construction, 2006
, 26(增刊2) : 23 -26 . DOI: A