ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Case Study the Invert Abrasion of Hydraulic Tunnel

  • LI Jia-Han ,
  • WANG Tai-Dian ,
  • QIN De ,
  • LIN Ming-Lang
Expand
  • 1.United Geotech, Inc.|Taipei;2.Taipei University of Technology|Taipei;
    3.Taiwan University|Taipei

Received date: 2007-06-06

  Online published: 2010-04-20

Abstract

One hydraulic tunnel was built in 1930's and located in southern Taiwan. The earliest lining was composed of various materials, including concrete without reinforced bars, bricks and stones, depending on the location along the tunnel and the position around the cross section in 1959. It was usually made of concrete in crown and bricks and stones in sidewalls in 1972. A preliminary inspection was carried out in 2003 and was repaired in 2004. The second and third inspection was carried out in 2005 and 2006. This paper will discuss the invert abrasion of hydraulic tunnel, and suggest the design of rehabilitation and maintenance for reference.

Cite this article

LI Jia-Han , WANG Tai-Dian , QIN De , LIN Ming-Lang . Case Study the Invert Abrasion of Hydraulic Tunnel[J]. Tunnel Construction, 2007 , 27(增刊) : 263 -267 . DOI: A

Outlines

/

〈 〉