Cross Passage of Overlapping Shield Tunnel
Achieved by means of RJP and Chemical Grouting

  • PENG Jian-Zhong ,
  • ZHANG Wu-Xun ,
  • GAO Zong-Zheng ,
  • SHU Dong-Hai ,
  • HU Ting-Hao ,
  • HUANG Zhi-Dong
Expand
  • 1.Director of the 5th Office, South District Project Office, TMRT, Taipei;
    2.Chief Director of South District Project Office, TMRT, Taipei;
    3.Chief Engineer of TMRT, Taipei; 4.PE of Sinotech.LTD., Taipei;
    5.Assistant Manager of Sinotech.LTD.,Taipei;
    6.Director of Tunnel Division, CK570A Project of Daiho Ltd., Taipei

Received date: 2007-06-06

  Online published: 2010-04-20

Abstract

The issue crosspassage between the overlapping tunnels with 210m radius curvature is located in front of the MRT intersection station in soft alluvial Taipei Basin. Soil around the crosspassage was strengthening by the triple pipe jet grouting method (RJPRodin Jet Pile) before boring tunnels. The soil between tunnels was improved by chemical grouting via the preinstalled holes in segments. Under intimate cooperation between the owner conscientious supervision and contractor technical construction , the crosspassage was successfully completed before the date.

Cite this article

PENG Jian-Zhong , ZHANG Wu-Xun , GAO Zong-Zheng , SHU Dong-Hai , HU Ting-Hao , HUANG Zhi-Dong . Cross Passage of Overlapping Shield Tunnel
Achieved by means of RJP and Chemical Grouting[J]. Tunnel Construction, 2007
, 27(增刊) : 530 -535 . DOI: B

Outlines

/

〈 〉