ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Technology of Connected Aisle in Subway Tunnel Bored by Shield

  • WANG Er-Beng ,
  • DIAO Guo-Jun
Expand
  • The 5th Municipal Division of Beijing Construction Co., Ltd. of China Railway Tunnel Group, Beijing 100022

Received date: 2007-03-19

  Revised date: 2007-05-22

  Online published: 2010-04-20

Abstract

The construction of connected aisle in the tunnel between Dengshikou station and Dongsi station on metro line 5 in Beijing is presented. Due to the high underground water level and complicated geological situation, the mining method was adopted to construct the aisle. The construction principle “The strong support, the triplepipe injection in advance, the vacuum dewatering, and the section excavation” has been performed. Moreover, monitoring and waterproofing in construction are discussed in this paper, which can be reference of other similar construction.

Cite this article

WANG Er-Beng , DIAO Guo-Jun . Construction Technology of Connected Aisle in Subway Tunnel Bored by Shield[J]. Tunnel Construction, 2007 , 27(增刊) : 551 -554 . DOI: B

Outlines

/

〈 〉