ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Application of Shield Machine in Construction of tunnels Crossing Yellow
River on Middle Line of SouthtoNorth Water Diversion Project

  • YANG En-Wen ,
  • HONG Xue-Yang
Expand
  • Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003

Received date: 2007-04-04

  Revised date: 2007-07-06

  Online published: 2010-04-20

Abstract

The geological conditions are complicated in the firststage construction of tunnels crossing Yellow River on the middle line of southtonorth water diversion project, which leads to having huge difficulties. The construction schemes, the style selection, the input and output conditions, the construction procedures and the auxiliary equipment in the construction of tunnels using the shield machine are discussed in this paper.

Cite this article

YANG En-Wen , HONG Xue-Yang . Application of Shield Machine in Construction of tunnels Crossing Yellow
River on Middle Line of SouthtoNorth Water Diversion Project[J]. Tunnel Construction, 2007
, 27(增刊) : 378 -381 . DOI: B

Outlines

/

〈 〉