Control Measures for Ground Settlement during Station Construction
with TunnelColumn Method
Received date: 2007-03-19
Revised date: 2007-05-30
Online published: 2010-04-20
The station presented in this paper is in the finesand layer, and passes through the heating, water, sewage and gas pipeline, and is in close proximity of some important buildings, therefore, controlling the settlement of ground during the construction of the station become very crucial. The techniques and measures in the construction of the threearch shallow station are discussed. The tunnelcolumn method is used to reduce the settlement and ensure the safety. In addition, the reasons of settlement and its distribution system during the construction of the largescale tunnels in urban areas are analyzed.
FU Chun-Jing
. Control Measures for Ground Settlement during Station Construction
with TunnelColumn Method[J]. Tunnel Construction, 2007
, 27(增刊)
: 465
-470
.
DOI: B
/
| 〈 |
|
〉 |