Key Construction Technology for Water rich Fully highly Weathered Sandstone Section of Xingwangmao Tunnel

  • JU Chong ,
  • YOU Xian-Meng ,
  • WANG Jun-Chao
Expand
  • (1. China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China;2. Project Management Department of TaiZhongYing Railway, China Railway Tunnel Group Co., Ltd., Jingbian 718500, Shanxi, China;3. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China)

Received date: 2009-12-17

  Revised date: 2010-01-25

  Online published: 2010-05-11

Abstract

Such key technologies as excavation technology, controlled blasting technology, watersealing grouting technology and mud inflow treatment technology adopted in the construction of the waterrich fullyhighly weathered sandstone section of Xingwangmao tunnel are expatiated in the paper. "Top heading + 2 benches" 6step method adopted ensures the tunneling safety, controlled blasting technology adopted ensures proper protection of the surrounding ground; the watersealing grouting technology adopted ensures cuttingoff the seepage path and the mud inflow treatment technology adopted ensures proper tunnelling advance.

Cite this article

JU Chong , YOU Xian-Meng , WANG Jun-Chao . Key Construction Technology for Water rich Fully highly Weathered Sandstone Section of Xingwangmao Tunnel[J]. Tunnel Construction, 2010 , 30(1) : 37 -43 . DOI: B