ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Discussion on Rapid Curtain Grouting Technology in Xiangshan Tunnel

  • YI Kai ,
  • ZHANG Ying-Hua
Expand
  • (1. Scientific Research Institute of China Railway Tunnel Group, Luoyang 471009, Henan, China;2. No. 1 General Branch of Armed Police Communications Engineering Troops| Chengdu 610041, China)

Received date: 2009-07-24

  Revised date: 2010-01-08

  Online published: 2010-05-11

Abstract

The curtain grouting constructions in 3 different hydrogeological sections of the main tunnel in No. 3 inclined shaft work lot of Xiangshan tunnel are compared. Three different grouting schemes, i.e., fullface curtain grouting, surrounding curtain grouting and local curtain grouting, are discussed. The influence of different grouting schemes on the construction efficiency under different hydrogeological conditions is analyzed. Optimal grouting schemes are determined, the grouting technology and the construction organization technology are optimized, which achieves better controlled construction cost and reduced construction period.

Cite this article

YI Kai , ZHANG Ying-Hua . Discussion on Rapid Curtain Grouting Technology in Xiangshan Tunnel[J]. Tunnel Construction, 2010 , 30(1) : 78 -83 . DOI: B

Outlines

/

〈 〉