A Study on the Face Stability of the Fine Sand Layer Bored by S-366 Shield Machine at Chengdu Metro

  • SONG Xiu-Yuan ,
  • DIAO Xu-Wei
Expand
  • 1.The 2nd Engineering Co.,Ltd.of China Railway 13th Bureau Group,Shenzhen 518000,Guangdong,China;
    2.Jilin Architectural and Civil Engineering Institute,Changchun 130021,China

Received date: 2009-03-18

  Revised date: 2009-04-01

  Online published: 2010-04-06

Abstract

Based on the practice of shield construction in Bid 2 of Chengdu Metro Line 1, a study is made on the excavation face balance and stability of fine sand layer bored by S-366 shield machine. An exemplary calculation of the establishment of two balance modes of EPB shield machine crossing through single stratum is made and a discussion is made to the 2 balance modes.

Cite this article

SONG Xiu-Yuan , DIAO Xu-Wei . A Study on the Face Stability of the Fine Sand Layer Bored by S-366 Shield Machine at Chengdu Metro[J]. Tunnel Construction, 2009 , 29(增刊1) : 1 -4 . DOI: A