Construction Technology of Earth Pressure Balance Shield Machine Crossing a River

  • YANG Guan-Jing ,
  • DAI Wei
Expand
  • 1. China University of Geosciences (Wuhan), Wuhan 430074,China;
    2.The 11th Engineering Bureau of China Railway, Wuhan 430071,China

Received date: 2009-03-26

  Revised date: 2009-04-01

  Online published: 2010-04-06

Abstract

The left tube and the right tube of the shield tunnel on Guangzhou Metro Line 6 (Datansha Station-Ruyifang Station) crosses Pearl River once respectively. During the construction, such measures as the application of earth pressure balance mode, boring parameters optimization, controlling of muck quantity, grouting quantity, position of shield machine and boring speed and muck improvement are adopted to ensure that the shield machine successfully crosses over the Pear River.

Cite this article

YANG Guan-Jing , DAI Wei . Construction Technology of Earth Pressure Balance Shield Machine Crossing a River[J]. Tunnel Construction, 2009 , 29(增刊1) : 26 -31 . DOI: B