ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Stabilization and Drill Bit Replacement for Special Stratum of Upper Soft and Lower Hard Layers

  • HE Hua-Lin ,
  • WANG Feng-Ju
Expand
  • Urban Rail Transit Company of China Railway First Group Co., Ltd., Xi'an 710059,China

Received date: 2009-03-18

  Revised date: 2009-03-27

  Online published: 2010-04-06

Abstract

For the shield construction of the subway tunnel, the “upper soft and lower hard” stratum layer is the most difficult to drill through. It is characterized by the fact that the drill bit is easily subject to damage and drill bit replacement cannot be carried out under atmospheric pressure or being pressurized. According to the particularity of the construction in Tianhai District, Shenzhen City, we adopt the method of stabilizing the cutting ring of the shield machine and the front part of the cutter head by rotary shotcreting pile and of mortar backfilling in the bin , which has completely solved the difficulty in drill bit replacement under “upper soft and lower hard” geological conditions, ensuring the safety of the person for drill bit replacement and making reboring with low cost and within short time.

Cite this article

HE Hua-Lin , WANG Feng-Ju . Stabilization and Drill Bit Replacement for Special Stratum of Upper Soft and Lower Hard Layers[J]. Tunnel Construction, 2009 , 29(增刊1) : 32 -35 . DOI: B

Outlines

/

〈 〉