ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Transportation within Tunnels over the Construction
of Long Shield Tunnel with Small Section

  • LIU Hun ,
  • ZHANG Beng ,
  • JIANG Chao
Expand
  • China Petroleum Pipeline Bureau No.4 Engineering Co., Ltd. Langfang 065000, Hebei, China

Received date: 2009-03-18

  Revised date: 2009-03-30

  Online published: 2010-04-06

Abstract

As restricted by tunnel clearance, transportation vehicles size and safety distance, only single-orbit transportation can be used in construction of small section shield tunnel. With the increase of the tunnel in length, transport time within the tunnel has become a bottleneck restricting the construction time. By analyzing various factors influencing transportation within tunnels, this thesis put forward the solution of unit transport of two rings of segment and materials. Checking calculations of parameters such as adhesion quality, starting traction quality and braking distance of the locomotives chosen in the solution are also carried out in this thesis, with proposal of assistant measures ensuring transportation safety.

Cite this article

LIU Hun , ZHANG Beng , JIANG Chao . Transportation within Tunnels over the Construction
of Long Shield Tunnel with Small Section[J]. Tunnel Construction, 2009
, 29(增刊1) : 43 -45 . DOI: B

Outlines

/

〈 〉