ISSN 2096-4498

   CN 44-1745/U

二维码
wenzhang

Construction Technology for Smallspaced Twintube Shieldbored Tunnels Crossing underneath close to High rise Assembled Residential Buildings

  • CA Yong-Li ,
  • FENG Xiao-Ke ,
  • CENG De-Guang ,
  • CHEN Yang-Ying
Expand
  • 1. Municipal Engineering Co., Ltd., Beijing Housing Group, Beijing 100029, China|
    2. Beijing urban engineering design and research institute Co.,Ltd.|Beijing 100037,China

Received date: 2008-03-18

  Revised date: 2008-05-16

  Online published: 2009-11-19

Abstract

MaizidianSanyuanqiaoLiangmahe shieldbored tunnel on Line 10 of Beijing Metro consists of twin tubes, which go parallel for 235m with only 1.7~3m net spacing. The tunnel crosses underneath close to a 12storey assembled residential building, with the horizontal net distance to the building foundations being 3.7~5m and the vertical net distance to the building foundations being 11.7m. The construction of the shieldbored tunnel is presented in the paper. The theoretical calculation equations and the measurement methods for the comprehensive looseness coefficient “K” are provided. In additional to the conventional construction measures, such as proper use of the articulations and overcutters, proper control of the thrust forces of the shields and timely retightening of the segment bolts, two items of new countermeasures are proposed for the construction of the curved sections of the shieldbored tunnels. The two items of new countermeasures include: 1) Due to the inertia of the shields, the shields start to bore on curved sections 3~5m ahead of the schedule and stop the boring on the curved sections 3~5m ahead of the schedule; 2) Due to the rotation of the shields on the curved sections when the segment rings are released, rotationrectifying measures are taken in advance.

Cite this article

CA Yong-Li , FENG Xiao-Ke , CENG De-Guang , CHEN Yang-Ying . Construction Technology for Smallspaced Twintube Shieldbored Tunnels Crossing underneath close to High rise Assembled Residential Buildings[J]. Tunnel Construction, 2008 , 28(3) : 314 -317 . DOI: B

Outlines

/

〈 〉