Case Study on Simultaneous Lining Construction Technology for
West Qinling Railway Tunnel Constructed by TBM

  • SU Rui ,
  • LIU Xiao-Xiang ,
  • GAO Wen-Shan
Expand
  • 1. LanzhouChongqing Railway Headquarters, China Railway 18th Bureau Group Co., Ltd.,
    Wudu 746000, Gansu, China; 2. LanzhouChongqing Railway Co., Ltd., Lanzhou 730050, China

Received date: 2010-04-07

  Revised date: 2010-04-15

  Online published: 2010-05-25

Abstract

The arrangement of the conveyor belts, flexible ventilation ducts, water supply pipes and high voltage cables for West Qinling tunnel with belt conveyor mucking system, which is constructed by TBMs, is presented in the paper. The design of the fullface hydraulic lining formwork jumbo is described. The paper can be served as reference for similar projects in the future.

Cite this article

SU Rui , LIU Xiao-Xiang , GAO Wen-Shan . Case Study on Simultaneous Lining Construction Technology for
West Qinling Railway Tunnel Constructed by TBM[J]. Tunnel Construction, 2010
, 30(2) : 125 -127,161 . DOI: B