Rule of Timedependent Stress of Tunnels in Wet Subsidence
Loess Constructed by 3bench Excavation Method

  • ZHOU Ye ,
  • LIU Zhong-Ren ,
  • LIU Xin-Beng ,
  • HU Suo-Bin
Expand
  • 1. LanzhouChongqing Railway Project Headquarters of China Railway 19th
    Bureau Group Co., Ltd., Dingxi 743001, Gansu, China|
    2. School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China|
    3. LanzhouChongqing Railway Co., Ltd., Lanzhou 730050, China

Received date: 2010-01-04

  Revised date: 2010-04-01

  Online published: 2010-05-25

Abstract

The rule of the timedependent strains of the tunnels in wet subsidence loess ground is revealed by means of monitoring of the wet subsidence loess ground. A kind of 3bench construction method is developed on basis of the rule of the timedependent strains. The deformation behavior of the tunnels constructed by 3bench excavation method is summarized as follows: After top heading excavation, the tunnel stability can maintain 7 days before settlement occurs; During the excavation of the second bench, the controlled settlement of the primary reinforcement structure of the top heading is allowed, which is a stress releasing process; The settlement deformation caused by the third bench excavation is similar to that caused by the second bench excavation; When the ring is closed after invert installation, the ground tends to be stable. 3bench construction is executed under the guidance of the above deformation rule in the construction of LanzhouChongqing railway and satisfactory effects have been achieved.

Cite this article

ZHOU Ye , LIU Zhong-Ren , LIU Xin-Beng , HU Suo-Bin . Rule of Timedependent Stress of Tunnels in Wet Subsidence
Loess Constructed by 3bench Excavation Method[J]. Tunnel Construction, 2010
, 30(2) : 128 -130,189 . DOI: A

Outlines

/

〈 〉