Tunnel Construction >

2010 , Vol. 30 >Issue 2: 131 - 133,178

DOI: https://doi.org/B

wenzhang

Comparison and Contrast between CRD Excavation
Method and 3bench 7step Excavation Method and Their Optimization

  • CUI Xiao-Feng ,
  • SUN Shao-Feng ,
  • WANG An-Hong ,
  • HOU Min
Expand
  • 1. CCCC Second Highway Engineering Co., Ltd., Xi'an 710065, China;
    2. LanzhouChongqing Railway Co., Ltd., Lanzhou 730050, China

Received date: 2010-01-13

  Revised date: 2010-03-25

  Online published: 2010-05-25

Abstract

CRD excavation method and 3bench 7step excavation method are compared, analyzed and evaluated in the paper. Furthermore, a new excavation method, i.e., bench method with core soil and temporary invert is proposed so as to enrich the tunnel excavation method.

Cite this article

CUI Xiao-Feng , SUN Shao-Feng , WANG An-Hong , HOU Min . Comparison and Contrast between CRD Excavation
Method and 3bench 7step Excavation Method and Their Optimization[J]. Tunnel Construction, 2010
, 30(2) : 131 -133,178 . DOI: B