Comparison and Contrast between CRD Excavation
Method and 3bench 7step Excavation Method and Their Optimization
Received date: 2010-01-13
Revised date: 2010-03-25
Online published: 2010-05-25
CRD excavation method and 3bench 7step excavation method are compared, analyzed and evaluated in the paper. Furthermore, a new excavation method, i.e., bench method with core soil and temporary invert is proposed so as to enrich the tunnel excavation method.