Comparison and Contrast among Different Construction
Methods for Doubletrack Railway Tunnels in Soft Ground

  • XU Yong ,
  • LIU Zhong-Ren ,
  • WANG Wei-Gao ,
  • KOU Jiang
Expand
  • 1. CCCC Second Highway Engineering Co., Ltd., Xi'an 710065, China;
    2. LanzhouChongqing Railway Co., Ltd., Lanzhou 730050, China

Received date: 2010-01-13

  Revised date: 2010-03-13

  Online published: 2010-05-25

Abstract

Serious settlement, convergence and deformation always occur during the construction of doubletrack railway tunnels located in soft ground. 3bench 7step construction method, CRD construction method and enlargedarchfoot bench method are adopted in the construction of Liangshui tunnel on LanzhouChongqing railway. These three construction methods are compared in terms of safety, advance rates and equipment availability. It is concluded that enlargedarchfoot bench method is more suitable for the construction of doubletrack railway tunnels located in soft ground.

Cite this article

XU Yong , LIU Zhong-Ren , WANG Wei-Gao , KOU Jiang . Comparison and Contrast among Different Construction
Methods for Doubletrack Railway Tunnels in Soft Ground[J]. Tunnel Construction, 2010
, 30(2) : 134 -136 . DOI: B

Outlines

/

〈 〉