Case Study on TBM Stepping Modes in West
Qinling Tunnel on LanzhouChongqing Railway

  • CHEN Da-Jun
Expand
  • Project Headquarters of XQLS2 Bid Section of West Qinling tunnel on LanzhouChongqing
    Railway, China Railway Tunnel Group, Wudu 746042, Gansu, China

Received date: 2010-01-08

  Revised date: 2010-02-20

  Online published: 2010-05-25

Abstract

West Qingling tunnel is constructed by TBM tunneling method assisted by drill and blast method. The stepping of TBM through the tunnel section constructed by drill and blast method is presented. The mode of stepping with arcshaped slide way and thrust cylinder and the mode of stepping with integral support frame and electrical motor drive are described in terms of technical features, key control points and operation methods. The two stepping modes are compared in terms of advantages and disadvantages. Finally, the mode of stepping with arcshaped slide way and thrust cylinder is chose.

Cite this article

CHEN Da-Jun . Case Study on TBM Stepping Modes in West
Qinling Tunnel on LanzhouChongqing Railway[J]. Tunnel Construction, 2010
, 30(2) : 162 -168,178 . DOI: B

Outlines

/

〈 〉