Risk Management in Construction of Highspeed Railway Tunnels
Received date: 2010-01-05
Revised date: 2010-03-05
Online published: 2010-05-25
The significance of risk management and the establishing of the risk management system are presented, with the tunnels in LYS2 bid section on LanzhouChongqing railway as examples. Risk identification, risk assessment, contermeasures and risk monitoring are discussed. The paper can be used as reference for persons specialized in the construction and management of tunnel works.
LI Meng . Risk Management in Construction of Highspeed Railway Tunnels[J]. Tunnel Construction, 2010 , 30(2) : 173 -178 . DOI: A
/
| 〈 |
|
〉 |