Case Study on Rock Mass Deformation Control of Large
Crosssection Tunnels in Mudstone Ground

  • ZHANG Xiu-Liang ,
  • DAN Guang-Rong ,
  • CHEN Jie-Hua ,
  • BO Ai
Expand
  • 1. China Railway 16th Bureau Group Co., Ltd., Beijing 100018, China|
    2. LanzhouChongqing Railway Co., Ltd., Lanzhou 730050, China

Received date: 2010-01-08

  Revised date: 2010-03-10

  Online published: 2010-05-25

Abstract

The deformation control method for large crosssection tunnels in mudstone ground is presented, with the construction of the entrance section of Hujiawan tunnel on LanzhouChongqing railway as an example. During construction, monitoring is executed to master the status of the rock mass deformation and temporary inverts and fanshaped supports are installed for the tunnel constructed by "top heading and bench" method so as to control the deformation. In the end, satisfactory results are achieved. The paper can be served as reference for the deformation control of the large crosssection tunnels on passengerdedicated railways.

Cite this article

ZHANG Xiu-Liang , DAN Guang-Rong , CHEN Jie-Hua , BO Ai . Case Study on Rock Mass Deformation Control of Large
Crosssection Tunnels in Mudstone Ground[J]. Tunnel Construction, 2010
, 30(2) : 179 -181 . DOI: B