ISSN 2096-4498

   CN 44-1745/U

二维码
Case Study on Comprehensive Construction Technologies for Ingates  of Running Tunnels of Beijing Metro
GUO Bin
Tunnel Construction . 2012, (2): 201 -204 .  DOI: 10.3973/j.issn.1672-741X.2012.02.015