ISSN 2096-4498

   CN 44-1745/U

二维码
Realtime Monitoring and Feedback Technologies for Open  TBM Transferring along Intermediate Ceiling of Metro Station
LI Hui
Tunnel Construction . 2012, (4): 581 -586 .  DOI: 10.3973/j.issn.1672-741X.2012.04.027