ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Overbreak/shortbreak Control Technology for and Cost Analysis on Rock Tunnels Constructed by Drilling and Blasting Method: Case Study on Tunnels on JiujiangRuichang Highway
FENG Haibao, JIANG Wande, QU Lili, GUO Qingjie
Tunnel Construction . 2012, (
6
): 887 -891 . DOI: 10.3973/j.issn.1672-741X.2012.06.024