ISSN 2096-4498

   CN 44-1745/U

二维码
Study on Construction Scheme Optimization of Shallowburied Tunnel undercrossing Existing Metro Station with Zeroclearance
YU Jun
Tunnel Construction . 2013, (1): 22 -26 .  DOI: 10.3973/j.issn.1672-741X.2013.01.004