ISSN 2096-4498

   CN 44-1745/U

二维码
Positioning Technology for Square Intermediate Piles of Metro Stations Constructed by Cutandcover Topdown Method
ZHAO Yuxi
Tunnel Construction . 2013, (7): 607 -614 .  DOI: 10.3973/j.issn.1672-741X.2013.07.014