Application of Steel Frame in Metro Station Constructed by Cutandcover Method: So as to Achieve Earlier Shield Launching
XIONG Guirong
Tunnel Construction . 2013, (12): 1064 -1070 .  DOI: 10.3973/j.issn.1672-741X.2013.12.015