ISSN 2096-4498

   CN 44-1745/U

二维码
Key Points in Implementation of Bonded Circumferential Prestressing of  Yellow River Crossing Tunnel on SouthtoNorth Water Diversion Project
SUN Zhenchuan, ZHONG Shengxing
Tunnel Construction . 2014, (1): 73 -77 .  DOI: 10.3973/j.issn.1672-741X.2014.01.012