ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Case Study on Refurbishment of Cutterhead and Main Drive of Slurry Shield for Xiangjiang River Crossing Tunnel in Changsha, China
BU Zhuangzhi, PU Xiaobo, FENG Peipei
Tunnel Construction . 2014, (
1
): 88 -94 . DOI: 10.3973/j.issn.1672-741X.2014.01.015