ISSN 2096-4498

   CN 44-1745/U

二维码
Study on Ground Penetrating Shieldbored Tunnel Calculation Parameters in Modified Routine Method
ZHANG Yinping
Tunnel Construction . 2014, (2): 101 -106 .  DOI: 10.3973/j.issn.1672-741X.2014.02.002