ISSN 2096-4498

   CN 44-1745/U

二维码
Case Study on Engineering Geological Conditions and Problems in  Construction of Headrace Tunnel of CCS Hydropower Station in  Ecuador by TBM Method
YANG Jihua, QI Sanhong, GUO Weixin, YANG Fengwei, LOU Guochuan
Tunnel Construction . 2014, (6): 513 -518 .  DOI: 10.3973/j.issn.1672-741X.2014.06.003