ISSN 2096-4498

   CN 44-1745/U

二维码
Measures to Ensure Rapid Boring of Open TBM Based on “4M+1E” Factors
XU Zan, XIE Peicai
Tunnel Construction . 2014, (6): 569 -575 .  DOI: 10.3973/j.issn.1672-741X.2014.06.012