ISSN 2096-4498

   CN 44-1745/U

二维码
Countermeasures for Shield Cutting and Passing Underneath Piles of Existing Pedestrian Bridge
CHU Kejun, ZHAO Liang, XU Qian
Tunnel Construction . 2014, (11): 1071 -1076 .  DOI: 10.3973/j.issn.1672-741X.2014.11.009