ISSN 2096-4498

   CN 44-1745/U

二维码
Excavation by “Vertical Deep Hole Presplitting Blasting and Horizontal Hole Smooth Blasting”Applied in Construction of a Large Underground Cavern
WEN Xinliang, ZHAO Kanglin
Tunnel Construction . 2015, (3): 262 -267 .  DOI: 10.3973/j.issn.1672-741X.2015.03.012