ISSN 2096-4498

   CN 44-1745/U

二维码
Discussion on Segment Erection Quality Control of Shieldbored Tunnels: Case Study on Line  1 of Shijiazhuang Metro
GUI Jinben, JI Gaoshan
Tunnel Construction . 2015, (S1): 69 -73 .  DOI: 10.3973/j.issn.1672-741X.2015.S1.014