ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Analysis on Adaptability of Cutterhead of a 7 m Shield in Composite Ground:Case Study on Running Tunnel from Chegongmiao Station to Hongshuwan Station on Line 11 of Shenzhen Rail Transit System
NING Rui, GUO Chao, HUANG Mingli
Tunnel Construction . 2015, (
S2
): 176 -180 . DOI: 10.3973/j.issn.1672-741X.2015.S2.032